The energy farmers need, and what would carry it

Every registered farmer counted on the platform cost model · planning estimate, measure before sizing

Farmers counted

20

Electricity demanded

4.87 GWh/yr

Diesel & fuel demanded

222.9k L/yr

Energy cost today

R19.6m/yr

Solar PV to carry it

3,339 kWp

Battery storage

5,744 kWh

Supply capex

R93.5m

Net saving

R9.3m/yr

Energy demanded

What all 20 farmers need

Farmers counted
20
14 from records · 6 on farm profiles
Electricity demanded
4.87 GWh/yr
R14.6m/yr at R3.00/kWh
Diesel & fuel demanded
222.9k L/yr
R5.0m/yr net of the SARS refund
Peak load
2,226 kW
sum of farm peaks · 0 farms off grid today
Heat & brooding
—
no poultry or dairy heat load recorded
Biogas from herds
—
no dairy or beef herd counted

Platform cost model per farm; farms without production detail counted on the documented farm profiles.

Holistic supply to carry it

What We Earth would supply, priced

Solar PV
3,339 kWp
R46.7m at R14,000/kWp · 19 farms with a load
Battery storage
5,744 kWh
R46.0m at R8,000/kWh · 40% critical × 4 h
Farm digesters
—
no herd large enough for a farm digester
Solar pumping
10 packages
R800k at R80,000 per 20 ha
Supply capex
R93.5m
PV + batteries + digesters + solar pumps, planning estimate
Net saving
R9.3m/yr
10 yr payback on PV + batteries

From our price list: ≈ R93.5m once-off for the advised systems · 6 items still to be quoted

Sum of every farm record's advised system at the documented rates (Solar Guide R14,000/kWp and R8,000/kWh; platform digester and pump packages). Measure before sizing.

Loading the full register… 20 farms so far

Energy systems & facilities

What We Earth can build for a farm, a cluster or a district

9 facilities we can build · 8 priced items · 13 reference designs (concept, not offers) · tap a card for what it includes and costs · Concept / preliminary — not for construction.

Reference sites

Concept designs from the proposals — evidence, not offers

Scroll for more →

District intelligence · funding pipeline · impact

The energy need of this clientele, counted

Planning estimate from platform data — measure before sizing
Electricity need
4.87 GWh/yr
R14.6m/yr at R3.00/kWh
Diesel & fuel need
222.9k L/yr
R5.0m/yr net of the SARS refund
Farmers in the pipeline
20
14 from records · 6 on farm profiles
Indicative PV to carry it
3,339 kWp
≈ R46.7m at R14,000/kWp · Documented benchmark
Biogas from recorded herds
—
0 farms with heat or brooding loads
Off grid today
0
0 no electricity · 0 on generators
DistrictFarmersElectricityDieselBiogasEnergy cost / yr
City of TshwaneGauteng22.66 GWh/yr127.7k L/yr—R10.8m
OR TamboEastern Cape71.20 GWh/yr54.4k L/yr—R4.8m
Tshwane MetroGauteng1397.8 MWh/yr11.9k L/yr—R1.5m
iLembeKwaZulu-Natal1272.6 MWh/yr9.5k L/yr—R1.0m
WaterbergLimpopo2253.3 MWh/yr10.4k L/yr—R993k
City of JohannesburgGauteng136.5 MWh/yr0 L/yr—R110k

+4 more districts in the pipeline.

Energy needs by place — target the market, click a district, get the siting advice. All sections count the 20 farms in view.

Energy needs by place

Pick who the programme targets, then click a district

The wash is where that kind of energy need is concentrated on the live register — cream is a light holding, teal a middle holding, navy the heaviest mass in view. Click a district for where to build, how big, what it costs and what it earns.

· 20 farms targeted · 4.87 GWh/yr · 222.9k L/yr diesel · R19.6m/yr
ConcentrationLowHighElectricity · kWh/yr · live register
Leaflet Tiles © Esri — Esri, DeLorme, NAVTEQ, TomTom

Districts in view

Select a district on the map or in the list. The plan, costing and facility advice appear for that district only.

How the numbers are made

One calculation chain, one cost ladder, no invented norms

Planning estimate from platform data — measure before sizing
  1. 1

    Farm loads

    kW × hours → kWh/day

  2. 2

    Water & pumps

    0.002725 × V × H ÷ η

  3. 3

    PV

    kWp = kWh/day ÷ (5.0 PSH × 0.80 PR)

  4. 4

    BESS

    critical kW × 4 h ÷ 0.62

  5. 5

    Cluster

    0.65 × Σ peaks · 3I²R feeder check

  6. 6

    Economics

    capex ÷ grid cost avoided

Planning cost ladder (R/kWh)

  • Solar PV · lowest routine energy — maximise daytime self-consumptionR1.10
  • Grid off-peak · flexible pumping and schedulable loadsR1.65
  • Grid blended · reference operating cost for savings and paybackR3.00
  • Diesel genset · backup and emergency onlyR6.60

Both technical proposals, p4. Grid and diesel refresh from the LiveIndicators feed when the app has one. PV capex R14,000/kWp (PV-only, "not an EPC quotation"); BESS R8,000/kWh (Solar Guide benchmark); yield 1,650 kWh/kWp/yr.

Worked example — WeEarth Farm Energy Formula Summary

A dairy with a 100 kW cooling system running 10 hours and a 50 kW milking system running 4 hours:

(100 × 10) + (50 × 4) = 1,200 kWh/day = 1.2 MWh/day

Pumping: a farm moving 100 m³ through 50 m of head at 70% efficiency needs 0.002725 × 100 × 50 ÷ 0.70 = 19.46 kWh.

E_day = Σ(P × h × n × LF) · E_week = P × h × d · E_month = E_day × D · E_year = Σ(P × h × d).

Farm Locations (14)
MarkerMarkerMarkerMarkerMarkerMarkerMarkerMarkerMarkerMarkerMarkerMarkerMarkerMarker
Leaflet Tiles © Esri — Esri, DeLorme, NAVTEQ, TomTom
By Support Type
By Commodity
By District / Municipality